Start Your Predictive Design Report

Please fill out as much data as possible for a better result. 

 If there is more info needed than supplied, Superod® Engineering Team will be in touch.  

A Gyro or Deviation Survey will be helpful in a crooked wellbore environment.

Please email to [email protected] and [email protected].

Well Information

Comments Here

Production Rates

Current Rod Design

Please use the slash key to give us the grade / and feet
Please use the slash key to give us the grade / and feet
Please use the slash key to give us the grade / and feet
Please use the slash key to give us the grade / and feet
Please use the slash key to give us the grade / and feet

Objetives (i.e. Increase Production, Unload Equipment, Corrosion Problem, etc.

Additional Information

Click or drag files to this area to upload. You can upload up to 10 files.